Australia Post Arundel, McNab
Industrial
Steel

Australia Post Facility

Project Summary

LOGOS
Client
632 tonnes
Steel
Gold Coast
Location
Australia Post
End User
632 tonnes of structural steel for a state-of-the-art Australia Post sorting and distribution facility.
Australia Post Arundel, McNab

Project Overview

Supplyhaus delivered the complete structural steel package for this purpose-built Australia Post sorting and distribution facility, spanning approximately 15,000 sqm.

Our scope included the design, fabrication and installation of 632 tonnes of bespoke structural steel, providing the structural framework required for a large-scale industrial facility designed around efficient sorting, processing and distribution operations.

From detailed design and coordination through to fabrication and installation on site, the project showcases Supplyhaus’ end-to-end structural steel capability and ability to deliver significant industrial infrastructure from design through to completion.

Gallery

Australia Post Arundel, McNab
Australia Post Arundel, McNab
Australia Post Arundel, McNab
Australia Post Arundel, McNab
Australia Post Arundel, McNab
Enquire now
Our Promise
We genuinely care.
We make it easy.
We deliver certainty.
Brisbane
Level 2, SW1, 32 Cordelia St South Brisbane QLD 4101
PO Box 5054, West End QLD 4101
Toowoomba
Level 1, 12 Neil Street Toowoomba QLD 4350
PO Box 2304, Toowoomba QLD 4350
Sunshine Coast
Level 5, Tower 2, Kon-Tiki Building 55-59 Plaza Parade, Maroochydoore QLD 4558
Gold Coast
Suite E312, Level 3, Oracle East Building, 4-6 Charles Avenue, Broadbeach QLD 4218
Sydney
Suite 5, Level 5, 66 Hunter Street Sydney NSW 2000
Vietnam
Cienco4 Building, Level 12, 180 Đ. Nguyễn Thị Minh Khai, Phuờng 6, Quận 3, Thành phố Hồ Chí Minh, Vietnam
Supplyhaus Showroom
435 Montague Rd, West End QLD 4101
Open by appointment

© 2026 McNab. All Rights Reserved. Cookies PolicyPrivacy Policy
Design and build by Bigfish